Changelog

Unlimited early scheduling + A new date switcher

Hi there, we just released a new feature: Unlimited early scheduling.

Initially, TurnShift was built with this concept: do not allow folks to book more than one month in advance. As weird as this seems, yes, this was the default setting.

Now the default setting will be "Unlimited early scheduling," and if you want to limit scheduling up to X months in advance, then you can also do that.

These settings can be configured on the schedule's settings page.

Unlimited early scheduling setting

Or

Limiting scheduling to a number of months ahead

We also upgraded the weird month switcher from the schedule's pages to the modern one from the calendar. So enjoy and have a lovely weekend!

PS: We're always making TurnShift better over time. If you encounter bugs or issues, use the chatbox on the left. Thanks!